Construction advances at Baowu Zhanjiang’s Phase II

Date:2020/11/10 Source: CISDI

As the master designer of Baowu Zhanjiang’s Phase II, CISDI recently attended the plant’s acceleration assembly meeting.

Phase II is under construction, with a No. 3 blast furnace at its epicentre.

The target date for all plants and systems is September 2nd, 2021.

CISDI has master-planned this phase and is designing an expanded stockyard, blast furnace 3 (which has a volume of 5,050 cubic metres and will be world-class), a new continuous caster and a new hot strip rolling line.

It is also designing expansions for Phase I’s water treatment plant, power supply and distribution system, lab system and solid waste treatment plant.

A number of CISDI’s state-of-the-art processes and equipment advanced tech have been applied to the blast furnace:

        BCQ no-bell top

        large blower

        top-combustion stoves

        dust catcher and integrated automation control system

A relied-on service provider for over 40 years, CISDI is a major player in Baowu Zhanjiang’s design and construction.

Total solutions CISDI provided for Phase I included the master design, stockyard, blast furnace 1 & 2, continuous caster and hot strip mill designs and contracted supplies.

CISDI’s innovative processes, expertise and equipment for Zhanjiang have contributed to a construction world record for a 10Mt/a green, super-efficient carbon steel plant.

 

 

CISDI and its partner construction companies attend Baowu Zhanijang’s Phase II assembly meeting

 

Baowu Zhanjiang, with an operational phase I and ongoing phase II, is master-designed by CISDI