CISDI to take Masteel’s stockyard green
Date:2019/3/14 Source: CISDI
CISDI to take Masteel’s stockyard green
Masteel has
once again placed its trust in CISDI’s transformational abilities.
Immediately
after contracting CISDI to take charge of an intelligent upgrade, the company
has entrusted it with the green upgrade of its primary stockyard bay 3.
Carried out on
an EPC basis, work will be online and will not halt production.
The existing
primary yard will be converted to a one-bay environmental-protection yard. Two sets of parallel full-gantry
scraper stacker-reclaimer facilities will be installed.
The new yard
will be able to meet the annual 16 million tonne requirements of the blast
furnaces a year and will utilise CISDI’s patented stockyard technology.
This will be
CISDI’s second reference for the upgrading technology, the first being at Baosteel Shanghai.
Fact file
CISDI’s
intelligent and eco-friendly stockyard creates an environmentally-friendly
storage area for materials, cleaner production and a wealth of cost-saving
benefits.
An intelligent
management system allows the stockyard to operate unmanned, and also improves
efficiency and reduces energy consumption.
The stockyard
technology has been awarded a Japanese patent and a Chinese patent prize for
excellence. Multiple benchmark references and performances have led to it being
honoured in China’s National Environmental Protection Science and Technology
catalogue.
Typical references
An external
view of Tangshan Ruifeng’s new green stockyard
An aerial view
of Formosa Ha Tinh Steel’s green stockyard, which was designed and built by
CISDI. It is the world’s largest single-phase capacity integrated yard
A night view of
Baowu Zhanjiang’s more environment-friendly stockyard